ROADDATA.AISAMPLE DATARequest Data
Toll crossings

How our fleet captures proof of a toll crossing

When a car crosses a tolled bridge or tunnel, our device records proof from the road camera at the entry and the exit, and uploads it with a crossing record. Below is a real crossing and how it works.

Example

George Washington Bridge, New Jersey → New York

Toll$16.79E-ZPass, car
Crossed16:32:43Z12 Oct 2026
DetectionCorridor2.5 m from the gantry
UploadedAll filesall in 71 s
Road ENTRY
Crossing confirmed
Road EXIT
Record in cloud
All clip files in
Road · Entry

Approach on the upper level, with the GWB tower ahead.

Road · Exit

Passing the New York tower under the large US flag, then onto the span.

Clips are 12 s at 256×144, the landmark clip resolution set over the air.

What every crossing uploads

A confirmed crossing produces 5 files: one crossing record and two 12-second road clips, each with a small sidecar file. The two videos are the billing proof. The sidecars carry time, place and geometry.

FilesCameraWhat it is
1 · .json—Crossing record: facility, direction, toll amount, time, GPS, geometry
2–3 · .mp4 + .jsonRoad12 s around the ENTRY
4–5 · .mp4 + .jsonRoad12 s around the EXIT
Crossing record (excerpt)
{
  "landmark_id": "PA_GWB",
  "facility": "George Washington Bridge",
  "direction": "forward",
  "direction_label": "New Jersey -> New York",
  "tolled": true,
  "toll_amount_usd_ezpass_car": 16.79,
  "crossing_time_ms": 1791822763652,
  "method": "corridor",
  "speed_mps": 12.73
}

How it works

The device recognises a toll crossing on its own and builds billing-ready proof automatically, with no one searching through footage.

1 · Config file

Every toll point is mapped

Each bridge and tunnel is stored with its exact location, road direction and toll amount. The file updates over the air.

2 · GPS

The car's position is tracked

GPS positions stream in throughout the trip, each with a satellite timestamp that cannot be changed on the device.

3 · Match

Crossing confirmed automatically

When the car's positions pass through a toll point in the right direction, the crossing is confirmed and the entry and exit clips are saved as proof.

Toll line Approach · 300 m Far side · 300 m Corridor · 90 m wide Entry confirmed ENTRY clips cut Crossing point between the two fixes Crossing confirmed EXIT clips cut

Need other bridges, tunnels or toll roads? Tell us which.

Request Data